Mechanical Building Services
Learn about the type of work that we carry out in the mechanical building services sector![](https://www.mellorandmottram.co.uk/wp-content/uploads/2020/02/STONEHENGE-SOUTH-POD-PLANTROOM-600x400-1.jpg)
What Work We Carry Out
-LPHW Heating
-Plant Room Replacment
-Radient Heating
-Underfloor Heating
-Chilled Water
-Chiller and AHU Replacements
-Air Conditioning
-Heat Recovery
-Ventilation Services
-Hot and Cold Water Services
-Building Management Systems
-Natural Gas Pipework Installations
-Screwed and Welded Pipework Installations
-Compressed Air
-Service and Maintenance
![](https://www.mellorandmottram.co.uk/wp-content/uploads/2020/02/images4O4OMDAG.jpg)
Where We Work
We carry out work to all of the following premises on a nationwide basis
-Hotels
-Schools/Education
-Hospitals
-Apartment Blocks
-Factories
-Churches
-Care Homes
![](https://www.mellorandmottram.co.uk/wp-content/uploads/2020/02/IMG_7546-scaled.jpg)
Project: Reg Haddon Boiler Replacement and Pipework Repairs
Client: Nuneaton Council
Value: £148,000.00
Scope of works
Removal of existing hoval boilers
Building management system modification
Two new 350kw mikrofill ethos boilers
Supply of our own in house temporary boiler plant
Full groundwork contract replacing incoming underground pipework mains
New flue system
Full aluminium clad insulation
All pipework carried out in welded and screwed steel
![](https://www.mellorandmottram.co.uk/wp-content/uploads/2020/02/IMG_7742-scaled.jpg)
Project: Cheveral Place Boiler Replacement
Client: Nuneaton Council
Value: £101,000.00
Scope of works
Removal of existing plant
Building management system modification
3 new mikrofill ethos boilers and 2 300 litre extreme water hot water cylinders
Supply of our own in house temporary boiler plant
New flue system
Full aluminium clad insulation throughout
![](https://www.mellorandmottram.co.uk/wp-content/uploads/2020/02/IMG_7463-scaled.jpg)
Project: Hereford Cathedral School Boiler Replacement
Client:Hereford Cathedral School
Value: £100,000.00
Scope of Works
Removal of two existing beston boilers
Two new hoval ultragas boiler
Full new building management system
Gas pipework alterations
New pumps
All pipework carried out in screwed and welded steel
Full aluminium clad insulation throughout
New pressurization equipment